1. PROJECT TITLE

“PHOTOVOLTAIC POWER PLANT 2” TREBINJE

2. SECTOR

Electric power

3. LOCATION

The location is located southeast of the urban matrix of the City of Trebinje, at a distance of about 12 km. Access to the subject location takes place from the local (macadam) road Trebinje-Ubla, which connects to the regional road R429 Trebinje-Herceg Novi. The distance from the regional road to the site in question is about 2 km.
The construction of the photovoltaic power plant would occupy a land area of about 901,919 m2 on the part of c.p. no. 1322/108, c.m. Zubci. The area that needs to be reserved for the construction of the high-voltage plant is 25,000 m2 and is identified as part of cadastral plot no. 1322/76, c.m. Zubci.

4. BRIEF PROJECT DESCRIPTION

The main purpose of a photovoltaic power plant is the production of electricity using photovoltaic modules and accompanying equipment and facilities. Photovoltaic modules use solar energy to produce electricity. In order to distribute it to the network, it is necessary to build substations and high-voltage facilities in addition to supporting equipment. Transformer stations are planned as prefab, concrete free-standing buildings (typical, prefabricated) with one or two transformer units. In addition to the MBTS, the construction of a facility for the management and supervision of the photovoltaic power plant as well as an auxiliary storage facility is planned.
In addition to the aforementioned facilities and contents, it is necessary to build a high-voltage plant in order to transmit the produced electricity to the public grid. The projected power of PP Trebinje 2 is 53.63 MW.

5. DETAILED PROJECT DATA

5.1. WHAT TYPE OF PROJECT IS IT?

(greenfield, brownfield, share in the ownership of an existing company, other (specify what))
“Photovoltaic Power Plant 2” is 100% owned by Elektroprivreda Republika Srpska.

5.2. PROJECT STATUS

(indicate at which level of preparation the project is currently, e.g. business idea only, conceptual design/feasibility study done; project documentation done, other)
It has an environmental permit and a building permit for preparatory works.

5.3. REASONS TO INVEST IN THE PROJECT

(how will the investor’s commercial interest be implemented, state the motivating factors to invest in the project, such as the existing workforce, available raw material base, number of potential suppliers, availability of infrastructure, competition in the environment, etc.)

6. PROJECT FINANCING

6.1. STATE THE ESTIMATED VALUE OF THE PROJECT IN EUR

The estimated value of the project is about 85 million convertible marks.

6.2. PLANNED SOURCES OF FINANCING

(full financing of the project by investors, public-private partnership, concession…)

6.3. INPUT BY LOCAL PARTNER

6.4. INPUT BY NVESTOR

7. HAS THE PHYSICAL LOCATION FOR THE IMPLEMENTATION OF THE PROJECT BEEN DETERMINED? (if yes, provide information: precise location of the project, by which planning document the location is defined, status of property relations, level of supporting infrastructure)

Photovoltaic power plant 2 Trebinje is planned to be built in the locality Zubačko polje on the cadastral parcel no. 1322/108 C.M. Zubci, City of Trebinje and covers an area of 901,911 m2.

8. HAVE THE ACTIVITIES ON PROJECT IMPLEMENTATION ALREADY STARTED? (e.g. permit issued for… feasibility study done, etc.)

We have an environmental permit and a building permit for preparatory works.

9. PROJECT APPLICANT WITH CONTACT INFORMATION

Mixed Holding “Elektroprivreda Republika Srpska”
Parent company, a.d. Trebinje
MH “ERS”-MP a.d. Trebinje,
Stepe Stepanovića b.b.
89101 Trebinje
Phone: +387 (59) 277 101; Факс: +387 (59) 277 120
www.ers.ba
e-mail: elektroprivreda@ers.ba